1. Pre-Installation Preparation

  • Conduct a site survey to determine the best locations for indoor and outdoor units.
  • Confirm power supply availability and capacity.
  • Ensure compliance with local regulations and safety standards.
  • Gather necessary tools, materials, and PPE (Personal Protective Equipment).

2. Indoor Unit Installation

  • Marking and Mounting:
    • Select wall locations ensuring proper airflow and minimal obstructions.
    • Use a spirit level to ensure accurate positioning.
    • Drill holes and mount the indoor unit’s bracket securely.
  • Pipe and Cable Routing:
    • Determine the best route for refrigerant pipes, drain pipes, and electrical wiring.
    • Drill a hole through the wall (if necessary) for external pipework.
    • Install trunking to enclose pipes and cables neatly.
  • Connecting Pipes and Wiring:
    • Connect refrigerant pipes to the indoor unit.
    • Ensure proper insulation to prevent condensation.
    • Connect drain pipe with a slight slope for efficient drainage.
    • Run electrical cables through trunking for a neat finish.

3. Outdoor Unit Installation

  • Positioning and Mounting:
    • Select a well-ventilated area away from obstructions.
    • Install anti-vibration mounts for noise reduction.
    • Secure the outdoor unit to a suitable surface or wall brackets.
  • Connecting Pipework and Electrical Wiring:
    • Route refrigerant pipes from the indoor unit through trunking to the outdoor unit.
    • Connect pipes securely, ensuring leak-free fittings.
    • Vacuum test the system to remove air and moisture.
    • Connect electrical wiring according to manufacturer specifications.
  • Final Sealing and Trunking Installation:
    • Secure all pipework and cabling within trunking for protection.
    • Seal trunking to prevent water ingress.

4. System Testing and Commissioning

  • Leak Testing:
    • Perform a pressure test to check for refrigerant leaks.
    • Charge the system with the correct refrigerant level.
  • Electrical Testing:
    • Check voltage and connections to prevent short circuits.
    • Ensure proper earthing and insulation.
  • Operational Testing:
    • Turn on the system and check cooling efficiency.
    • Verify airflow, temperature control, and drainage function.
  • User Training and Handover:
    • Explain operation and maintenance to office staff.
    • Provide documentation and emergency contact details.

5. Post-Installation Clean up and Safety Checks

  • Clear all debris and dispose of packaging properly.
  • Conduct a final safety inspection.
  • Schedule a follow-up visit if necessary.
Menu
Envirotech
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.